NHG building inspection report: when you need one and how to fill in the model

A building firm that makes a report for NHG, the Dutch National Mortgage Guarantee, uses NHG's Model bouwkundig rapport (model building inspection report). The lender asks for it if the valuation report mentions too much overdue maintenance, a need for further investigation or a poor condition.

Animated demo: the NHG annex for an apartment builds up, from the administrative details to the signature. Administrative details, Every code, per storey, Action per item and k.v., Summary sheet and signature.

What is Keursnel?

Keursnel (keursnel.nl) is software for building inspections of homes in the Netherlands: you record what you see per building part, and Keursnel turns it into the report, the cost overview and the NHG annex, in your firm's house style. Free for 3 reports a month; after that €25 per inspection, or from €7.50 per inspection with a subscription (excl. VAT).

What the NHG model asks, and how Keursnel fills it in

A building firm that makes a report for NHG uses NHG's Model bouwkundig rapport (model building inspection report). NHG does not approve software: the lender checks the report. This is what Keursnel puts in the NHG annex, with NHG's programme of requirements and recommendations at the end.

  • Administrative details in four blocksApplicant, inspection body, home and accountability. You enter the KvK (Chamber of Commerce) number and how your firm is registered once, under Instellingen, Bureau (settings, firm). If either is missing, Keursnel warns you.
  • Date of the inspection and name of the inspectorWithout an inspection date or an inspector, you cannot deliver. The check before delivery then holds the report back.
  • Signature by the inspectorThe inspector signs once with a finger, pen or mouse, under Instellingen, Bureau. After that, the signature appears in every annex. If it is missing, Keursnel warns you in Controle and with the report.
  • The 18 element codes, with the B codes per storeyAll 18 codes, with the names used in the model. The A codes are all included, even without costs. The B codes are in a table per storey: cellar, ground floor, each upper floor and loft.
  • The action per item: S, H, V, N or OKeursnel derives the letter from the advice for the defect: slopen (demolish), herstellen (repair), vervangen (replace), nieuw aanbrengen (install new) or overig (other). An improvement is not a defect and gets no letter.
  • Cost split (k.v.) in apartment buildingsFor an apartment, you enter one percentage. For ten shared codes, such as foundation, roof and facade, only the home's share then counts. The share of the other owners is shown separately.
  • Immediate and longer-term necessary costs, kept apartWithin 1 year counts as immediate, within 5 years as longer term. They are in separate columns, with totals per table and for the home.
  • Improvement on a line of its ownImprovement costs are shown separately and do not count towards the totals.
  • Large cost items under a code, if need be under miscellaneousIn the template, every item with costs has a code, or is explicitly outside the NHG model. Items without a code are shown separately, so the annex and the cost overview match.
  • Further investigation in the remarksItems rated “further investigation” go to the remarks automatically.
  • Costs including VATKeursnel's rates include VAT. The annex states whether the amounts include or exclude VAT.
  • A summary sheet (verzamelstaat) with totals per storeyThe lines of the model: total general, cellar, ground floor, upper floors, loft and home. Each line has immediate, longer term and total. Items without a storey are on a line of their own and count towards the total.
  • The programme of requirements and recommendations that the codes refer toIt is at the end of the annex, word for word from the model, with the related rules from the Bbl (the Dutch building regulations).

Last reviewed:

This is not legal advice. If in doubt, check the official source or ask an expert.

When does NHG ask for a building inspection report?

NHG sets out its rules in the Voorwaarden en normen (terms and standards). These rules are meant for the lender. Section C.5.2.1 names three situations in which a building inspection report is needed. You see them in the valuation report, and one situation is enough.

The first is overdue maintenance that needs to be repaired soon. Take the average of the immediate costs that the valuer estimates. If that is more than 10% of the market value with vacant possession, the report is needed.

A worked example. The market value is €300,000. The valuer estimates the immediate costs at €28,000 to €36,000. The average is €32,000. That is more than 10% (€30,000), so the report is needed.

The second situation: according to the valuation report, further building investigation is needed. The third: the structural condition of the home is poor.

With a hybrid valuation, a building inspection report is not required for NHG. The lender may still ask for one if it thinks an inspection is needed.

The Voorwaarden en normen contain no rule about the year of construction. If a bank asks for an inspection because of the age of the home, that is the bank's own requirement, not NHG's.

The valuer is not allowed to make the required building inspection report. NHG cites a possible conflict of interest as the reason.

This is not legal advice. If in doubt, check the official source on nhg.nl.

What does NHG require of the author and the report?

Section C.5.2.2 names three kinds of author: a municipality, Vereniging Eigen Huis (the Dutch homeowners' association) or a building firm registered with the KvK (Chamber of Commerce).

NHG gives examples of a building firm: an architect's firm, a building consultancy, a contractor or a building damage assessment firm. In the model, you tick how your firm is registered. There are four choices: damage assessment firm, architect's firm, building consultancy and contractor.

The author must be independent. You are not involved in the purchase, sale, brokerage, valuation or financing of the home, and you have no ties with the buyer, the seller or the lender.

If a municipality or Vereniging Eigen Huis makes the report, NHG sets no format rules. A building firm, however, must use NHG's Model bouwkundig rapport.

The report must be no more than 12 months old. The text does not say from which date to count. Keursnel puts both the date of the inspection and the date of the report in the annex.

The Voorwaarden en normen and the model set no requirements for a diploma, certificate or register. In short, NHG asks this of a building firm:

  • Registration with the Kamer van Koophandel (Chamber of Commerce)
  • Independence from purchase, sale, brokerage, valuation and financing
  • Use of NHG's Model bouwkundig rapport
  • A report that is at most 12 months old

Which version of the model applies?

The Voorwaarden en normen 2026-1 have applied since 1 January 2026. They apply to loans with a binding offer on or after that date.

The Model bouwkundig rapport is annex 3 to the Voorwaarden en normen 2026. You can find it via the Document werkprocessen (work processes document), which accompanies the Voorwaarden en normen. The content is the same as the 2025 model. Note: the footer still gives 1 January 2025 as the start date.

On 1 January 2027, the Voorwaarden en normen 2027-1 come into force. The model's content stays the same. So do the rules about when a report is needed, who makes it and the 12-month limit.

New in 2027 is a rule about foundation risk in the valuation report. That rule belongs to the valuation, not to the building inspection report.

Older models are still online, including those from 2020, 2023 and 2024. The 2024 model referred to the Bouwbesluit (the former Dutch building decree). The current model refers to the Besluit bouwwerken leefomgeving (Bbl), the Dutch building regulations. So always get the model from nhg.nl.

What is in the Model bouwkundig rapport?

The model is a four-page fillable form, preceded by explanatory notes. At the top are the administrative details in four blocks: applicant, inspection body, home and accountability.

Then comes the summary sheet (verzamelstaat). It has lines for general, cellar, ground floor, upper floors, loft and the whole home. Each line has columns for immediate, longer term and total. Below them are a line for improvement and a box for remarks.

After that come two tables with 18 codes in total. The A codes cover general building elements, such as foundation, crawl space, roof and fire safety. You fill in the B codes per storey. Think of facades, window and door frames, floors, sanitary fittings and ventilation.

The k.v. is the cost split (kostenverdeling) in apartment buildings. It is the share of the costs that belongs to the home. NHG gives an example: €10,000 of costs across 4 apartments gives 25%, so €2,500.

You always inspect the building elements in the tables. Large costs for other building elements go under miscellaneous. So do defects in other building elements that affect safety, health or use. If further investigation is needed, you note that in the remarks.

At the back is the programme of requirements and recommendations. For most codes it says what needs to happen, often with a reference to the Bbl. For the crawl space, for example, it asks for at least two mouse-proof ventilation openings for a facade up to and including 5 metres wide.

For each line in the tables you fill in these columns:

  • Code: the reference to the programme of requirements
  • Location and description of the defect
  • Action: S slopen (demolish), H herstellen (repair), V vervangen (replace), N nieuw aanbrengen (install new) or O overig (other)
  • k.v.: the percentage of the costs for this home
  • Costs: immediately necessary and necessary in the longer term

Which requirements apply to the costs?

The notes to the model say how you estimate the costs. You use contractor prices, not DIY costs. The amounts include VAT. You assume repair where possible, not complete replacement.

You assume that the contractor can work without interruption. Propping, demolition and scaffolding are not included. Nor is consequential damage.

If the report shows overdue maintenance that must be repaired immediately, you price it as if a firm does the work, even if the buyer wants to do it themselves.

The model does not define “immediate” in years. In Keursnel, immediate means within 1 year.

There are three kinds of costs, and you keep them apart:

  • Immediately necessary: repairs needed now to prevent further damage
  • Necessary in the longer term: maintenance within 5, 10 or 15 years, with a maintenance plan
  • Improvement: based on an improvement plan or a quote

How does Keursnel fill in the model?

First of all: NHG does not approve software. The lender checks whether the report meets the requirements. The overview above sets each requirement next to what Keursnel does. This section explains how that works while you inspect.

You do not fill in the NHG annex separately. You choose what you see for each building element. Costs that come with an answer count under an NHG code. Keursnel turns that into the tables and the summary sheet.

Below the answers you see which code the costs count under. You can change or remove the code. You then give a reason, and it goes into the report.

The B codes are listed per storey. Choose the storey for an item, or once for a building element, such as a bathroom. Facades, exterior frames and exterior paintwork are on the ground floor by default. If there is no storey, the item appears under “Bouwlaag niet aangegeven” (storey not specified) and Controle warns you.

The annex matches the cost overview. Improvement costs and items without an NHG code are shown separately. That way, you can see where each amount ends up.

Under Instellingen, Bureau (“settings, firm”), enter your KvK number, the registration and the inspector's signature. If anything is missing, Keursnel warns you in Controle and with the report. You can still deliver without them. As long as they are missing, they are not in the annex you share or print.

For a partial inspection, Keursnel makes no NHG annex. The model covers the whole home. Not sure whether a lender will accept the annex? Ask beforehand.

The annex also contains:

  • The B codes in a table per storey: cellar, ground floor, each upper floor and loft
  • The summary sheet with the lines of the model, including a total for the upper floors
  • NHG's programme of requirements and recommendations, at the end of the annex
  • The code names from the model, such as A.6 Diversen (miscellaneous)

Frequently asked questions

Is a building inspection report always required for NHG?

No. It is needed if the valuation report shows one of three situations. These are overdue maintenance above 10% of the market value, a need for further building investigation, or a poor structural condition. With a hybrid valuation, it is not required for NHG, but the lender may ask for it.

Can the valuer also make the building inspection report?

No. According to NHG, the valuer is not allowed to make the required building inspection report, because of a possible conflict of interest. Conversely, the valuer must not have been involved in the inspection either.

How old can a building inspection report for NHG be?

At most 12 months. That is in section C.5.2.2 of the Voorwaarden en normen. The text does not say from which date you count. So include both the date of the inspection and the date of the report.

Does NHG approve software for the building inspection report?

No. NHG does not approve software or inspectors. The lender checks whether the report meets the requirements. Keursnel makes an NHG annex with the codes and cost layout of the NHG model.

Can I make my own report with the NHG model as an annex?

The Voorwaarden en normen require a building firm to use the model. The current text says nothing about a more extensive report of your own alongside it. Keursnel makes such a report, with the NHG annex as one of its parts. If in doubt, check with the lender.

What do the letters S, H, V, N and O mean?

They are the action per item in the model: slopen (demolish), herstellen (repair), vervangen (replace), nieuw aanbrengen (install new) or overig (other). O needs an explanation; in Keursnel, that is the advice. Keursnel derives the letter from the verb in the advice. If there is no recognisable verb, it becomes O. An improvement item is not a defect and gets no letter.

Inspect without the hassle afterwards